HHP40 and SV600 Complete Installation Project for Decommissioned Destroyer Zhanjiang

Sep 01, 2022

|

Hydraulic Impact Hammer

At the Potou District Olympic Sports Center pier project in Zhanjiang, Guangdong, STARKE piling equipment delivered an outstanding performance in the decommissioned destroyer Zhanjiang installation project. The construction, involving critical foundation piling for vessel displacement and positioning, utilized a combined solution of the HHP40 (600kJ) hydraulic impact hammer and the SV600 (4100kN) high-power vibratory hammer.

Paired with the high-performance P700 power pack, the HHP40 demonstrated exceptional penetration efficiency and stability during suspended driving operations. Faced with an urgent schedule, the technical team and equipment achieved seamless coordination. Through continuous overnight operations, they not only met the stringent precision requirements for the piles but also significantly accelerated the project delivery timeline. Leveraging its integrated advantages in large-tonnage marine engineering foundations, STARKE has provided robust equipment assurance for this significant national installation project.